Monday, November 2, 2009

Fall on the RGS



Work began on the retaining wall for the engine house track. This will be filled with the crusher run rock which I am going to use for base on the railroad (since the trucking company brought me the wrong stuff...)




The leaves blown off the railroad and the area where this wall is being built for the engine house track. It's in this area where the temporary engine house will be built.



Leaf fall. A couple cold rainy weeks and then a windy night and all the leaves fall. This is what the bridge looked like before I spent an hour blowing leaves around the house...

No comments:

Post a Comment